Your search found 6 records
1 Abdullaev, Iskandar; Yakubov, Murat. 2004. Assessing the gender performance of the water users associations of Central Asia: case study from IWRM Ferghana Project. Paper presented at the ICWC 39th Annual Water Conference, Almaty, Kazakhstan, 19-21 May 2004. 11p.
(Location: IWMI-HQ Call no: IWMI 631.7.3 G570 ABD Record No: H036248)
2 Yakubov, Murat. 2008. Measuring irrigation performance: governance versus management perspective: a mixed methods case study of the IWRM-Ferghana Project. Dissertation submitted to the Department of Applied Social Science, London Metropolitan University, London, UK, for the degree of Master of Research in Social Research. 104p.
(Location: IWMI HQ Call no: e-copy only Record No: H041915)
(0.83 MB)
3 Yakubov, Murat. 2009. Project’s impact assessment framework and design – activity C2.1. Finalized document. Report prepared under the project of Integrated Water Resources Management in Fergana Valley, phase IV. Tashkent, Uzbekistan: International Water management institute (IWMI); Berne, Switzerland: Swiss Agency for Development and Cooperation (SDC). 33p.
(Location: IWMI HQ Call no: e-copy only Record No: H046467)
(0.54 MB)
4 Yakubov, Murat. 2010. The 2009 Impact Assessment Study. Report prepared under the project Integrated Water Resources Management in Fergana Valley, phase IV. Tashkent, Uzbekistan: International Water management Institute (IWMI); Berne, Switzerland: Swiss Agency for Development and Cooperation (SDC). 79p.
(Location: IWMI HQ Call no: e-copy only Record No: H046468)
(1.05 MB)
5 Yakubov, Murat. 2012. The 2011 impact study report: project impacts on the population-at-large (kitchen gardeners' perspective). Report prepared under the project Integrated Water Resources Management in Fergana Valley, phase IV. Tashkent, Uzbekistan: International Water management institute (IWMI); Berne, Switzerland: Swiss Agency for Development and Cooperation (SDC). 64p.
(Location: IWMI HQ Call no: e-copy only Record No: H046469)
(1.63 MB)
6 Yakubov, Murat. 2010. The 2009 main canal level assessment study. Report prepared under the project Integrated Water Resources Management in Fergana Valley, phase IV. Tashkent, Uzbekistan: International Water management Institute (IWMI); Berne, Switzerland: Swiss Agency for Development and Cooperation (SDC). 32p.
(Location: IWMI HQ Call no: e-copy only Record No: H046470)
(0.59 MB)
Powered by DB/Text
WebPublisher, from