Your search found 5 records
1 Perera, K. D. P.. 1984. Place of farmer associations within project management. 6p.
(Location: IWMI-HQ Call no: P 426 Record No: H0924)
2 Perera, K. D. P.. 1987. Experience of integrated management of major irrigation settlement schemes (INMAS) programme on water management in Sri Lanka. In FAO. Regional Office for Asia and the Pacific. Efficient use of water in paddy irrigation project. Vol. III (pp. 1-32). Bangkok, Thailand: RAPA.
(Location: IWMI-HQ Call no: 631.7.1 G570 FAO Record No: H02317)
3 Perera, K. D. P.. 1987. Irrigation design for management: Irrigation in Sri Lanka. In Hydraulics Research Limited; IIMI; ODA; Sri Lanka. Irrigation Department, Irrigation Design for Management - Asian Regional Symposium, Kandy, Sri Lanka, 16-18 February 1987: Vol. II - Special lectures and discussions. Wallingford, UK: Hydraulics Research Limited. pp.23-32.
(Location: IWMI-HQ Call no: IIMI 631.7.8 G570 HYD Record No: H003015)
(0.55 MB)
4 Perera, K. D. P.. 1988. Kirindi Oya Irrigation & Settlement Project. SLNCOLD Bulletin, 1(2):6-25.
(Location: IWMI-HQ Call no: P 2929 Record No: H03522)
5 Gunawardena, W.; Perera, K. D. P.. 1990. management of irrigation systems maintenance: desirable levels, estimated cost, and institutional requirements based on a case study in Sri Lanka. In IIMI Resource mobilization for sustainable management: proceedings of a Workshop on Major Irrigation Schemes in Sri Lanka, Kandy, Sri Lanka, 22-24 February 1990. Colombo, Sri Lanka: IIMI. pp.89-104.
(Location: IWMI-HQ Call no: IIMI 631.7.3 G744 IIM Record No: H006927)
(0.57 MB)
Powered by DB/Text
WebPublisher, from